Rivermist Excavating was hired by the District of Logan Lake to complete the development of 9 new single family residential building lots for phase 3A of the Ironstone Ridge Subdivision. Over the following 2 years, Rivermist was then brought back for phases 3B and 3C to complete 23 more lots.

Throughout the project, crews relocated 19,325 cubic meters of native soil, and installed 900 meters of water mains and services, including fire hydrants and water meter chambers. Crews also installed 890 meters of sanitary sewer mains and services, plus manholes, and 730 meters of storm sewer mains and services. Swales and French drains were created to divert ground water around the subdivision. Finally, our team installed shallow services including Hydro, Telus and Shaw. For surface works, we completed 1 km of paved roadway, including curb, gutter and sidewalk.

default alt text

Fast Facts:

  • Project Scope: 32 residential lots
  • Earthworks: 19,325m³ of soil relocation
  • Utilities Installed: 900m of water mains (including hydrants and water meter chambers), 890m of sanitary sewer mains and manholes, 730m of storm sewer mains, Hydro, Telus, Shaw Services
  • Road Construction: 1km of road, including curb, gutter, sidewalk
  • Environmental Care: Installed swales and French drains to divert ground water, catch basins
  • Completion: September 2022